CIVIL ENGINEERS PRATICAL WORKS [CEPW]

civil engineering practical works 2020,civil engineering practical knowledge,practical knowledge of civil site engineer,practical knowledge of construction,civil engineer must know pdf,civil engineering fundamentals 2020,things a civil engineering student must know,general knowledge in civil engineering,civil engineering site knowledge

Showing posts with label Form work. Show all posts
Showing posts with label Form work. Show all posts

Tuesday, May 5, 2020

[MOST] IMPORTANT KNOWLEDGE FOR ALL CIVIL SITE ENGINEERS:-


Types of Formwork (Shuttering) for Concrete Construction and ...
vertica shuttering
Roof Beam Formwork Fabricated At Construction Site. The Formwork ...
Horizzontal shuttering
FORMWORK:-


Basically we know form work means shuttering work but, It is not a shuttering work it actually  a temporary mold of wooden or M.S PLATE . fresh concrete to provide required shape size & strength to a structural member such as beam,column,slab etc.




















BASICALLY FORMWORK 3 ( THREE) TYPES :-   

  1. SHUTTERING
  2. CENTERING
  3. STAGGING                                                                                                                                                                    
                                                                                               
1:- SHUTTERING:- 
The formwork which is used vertical structural members such as columns, Rcc walls  etc, known as Shuttering.     

China Wall and Column Concrete Formwork Plywood with H20 Timber ...
Vertical Shutteing(Shuttering)
     

                                                                                                                                                                                                                                                                                                  

                                                                   


2:-CENTERING:- The formwork which is used for horizontal structural members  such as Slab,Beam etc , known as centering.                                                                                                                 

Safety, Installation, and Removal of Formwork
Horizontal shuttering(Centering)

                                                                                       

3:-STAGGING:- The form work which supports both shuttering & centering as per                                                         design propern position, such as steel pipes ,props, ballies etc.                                                                                                                                                                                                                      
Common Defects in Concrete Formwork Systems
Pipes,Props& Bolt


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 CONSTRUCTION SITE YOU SEE MANY TYPES OF SHUTTERING USED:-
Timber formwork advantages | Timber Merchants Hampshire
Timber Shuttering
1:- TIMBER SHUTTERING                                                                                                                 
   
(a)-well seasoned.
(b)-light in weight.
(c)-Easily workable.
(d)-Free from looks knots.


2:-PLYWOOD SHUTTERING                                                                                                              


Waterproof Shuttering Ply 34 Kg, Size: 8x4 Sqft, Rs 46 /square ...
Plywood Shuttering

(a)-Smooth finish.
(b)-Saving in the labour cost of fixing & dismentaling.
(c)-Number of reuses are more.


3:-STEEL SHUTTERING

Formwork in Construction|Types|Applications of Shuttering ...
Steel Shuttering
(a)-Stronger,durable & have long life
(b)-Installed & Dismentaled with greater ease
(c)-Quality
(d)-Not absorb moisture
(e)-Not shrink or warp



             (KEEP LEARN & IMPROVE YOURSELF)